Case Study
Stein Service & Supply Wins Project of the Month
Stein Service & Supply is proud to be recognized once again as Project of the Month by Panel Built, Inc., following our previous win in 2020. This achievement highlights our continued commitment to innovative warehouse solutions and strong industry partnerships.
A Smart, Functional Design for a Charlotte-Based Customer
In collaboration with Panel Built, Inc., our team designed and manufactured a large modular enclosure for a customer in Charlotte, NC. This project was developed to house essential machinery within an active warehouse environment, which offers a clean, controlled, and durable workspace that enhances safety and efficiency.
The enclosure spans 4,292 square feet and reaches 17 feet, 2 inches tall, featuring both 9’ and 17’ wall sections to accommodate varying equipment heights. Built with 3-inch-thick FRP and gypsum wall panels in a clean white finish, the structure combines durability, easy maintenance, and a professional aesthetic suitable for industrial applications.
Built for Performance
The enclosure’s 22-gauge steel B-deck roof supports lighting, ceiling components, and HVAC systems, ensuring reliable overhead performance. The interior includes:
- Multiple 8’ x 12’ roll-up doors for easy equipment access
- Tempered glass windows for visibility and light
- A fully integrated electrical setup designed by Panel Built
- Every aspect of the project was engineered to meet real-world industrial demands while maintaining long-term strength and functionality.
Collaboration & Results
Projects like this reflect Stein Service & Supply’s expertise in modular construction, racking, and warehouse optimization. We’re grateful to Panel Built, Inc. for their continued partnership and proud of the results delivered for our Charlotte customer.
Special thanks to John Mayo and the entire Stein Service & Supply team for their outstanding work bringing this project to life.
More Projects
Case Study
Specialty Steel Fabricator
ISO 8 modular cleanroom with industrial mezzanine and integrated vertical lift system installed at a specialty steel fabrication facility in Charlotte, NC. View Project
Case Study
Baby Products Distributor
Stein Service & Supply delivered a two-phase relocation with new pallet racks, wire cages, and turnkey warehouse installation creating space to grow safely. View Project
Case Study